Greensmower Brushes

We recently updated our Toro Flex 21 greens mowers with brushes. Last year we experimented with one mower/brush setup and were very excited with the results on the greens surface. This season we made the decision to adapt all six greens mowers with brushes to allow us to brush more frequently as conditions allow. 

The brushes ride out in front of the cutting reel at just the perfect angle and essentially stand up and comb out the grass before it's mowed, similar to combing out your hair before cutting. Brushing helps to eliminate grain, tightening the surface and ultimately improving ball roll distance on the greens.

The addition of brushes to our greens mowers has already been noticed in the overall quality of the putting surface this season and will be a great new tool in our greens management program arsenal.

Thursday, June 5, 2014

Bunker Edging

How do you maintain the bunker edges and lips? We get this question periodically from the membership and want to take this opportunity to show you our weekly process with some pictures taken today. 

Sand is moved away from the very edge of the bunkers to better expose for trimming and reclaim places where sand has been pushed up near the grass. The top and inside edges of the bunkers are then trimmed with a string trimmer by staff members with the ultimate precision and steady hands. The goal here is to simply maintain the nice clean inside edge by removing the new growth with a light frequent haircut.

After the bunkers are trimmed, all the clippings are blown out and removed from the surrounding rough. It's very important to keep the bunkers clean and free of contamination throughout the season.

The sand is then moved back against the edges of the bunkers and packed to maintain a nice consistent 2-3" lip on all bunkers. During this process bunker sand depths are also checked and sand is moved around accordingly.

The bunkers are then raked and ready for playing action. This process is very effective for us and maintains very nice, crisp, clean looking bunkers with excellent playability.

Finished product! This process is part of our normal maintenance program and is performed weekly during the high growth times and biweekly during the slower growth periods.

Wednesday, June 4, 2014

Silver Maple Samara

The silver maples sure have started to make a mess all over the golf course this past week, making it a challenge to find your golf ball and mow daily! The dense clusters of samara this season and the recent experienced high winds sure creates a huge mess. The silver maples fruit are samaras, each containing a single seed, and winged in shape, often referred to as helicopters. 

 The challenge for the grounds team is cleaning all the greens, tees and fairways each morning before we begin our daily mowing routines. We send out 5-6 guys each morning armed with backpack and pro force tow behind blowers to clean off all short grass ahead of the mowers. Blowing helicopters is quite a challenge as they have a tendency to want to "stick" to the ground and only move short distances.

The flowers on Silver Maples are in dense clusters, produced before the leaves in early spring,with the seeds maturing in early summer. The fruit are the largest of any native maple. Although the wings provide for some transport by air, the fruit are heavy and are also transported by water.

The major seed drop seems to be winding down at this time and things will be back to normal very soon. We are working together as a team to cleanup the mess and we will win this fight. 

Friday, May 23, 2014

Planting Annuals

The time has come once again to get all the annual flower beds prepped and planted for the summer season. We wait to get started planting annuals until the weather warms up and the chance of frost decreases, normally around the middle of May to Memorial Day. 

Meet Lorraine our horticulturalist here at Gull Lake Country Club. Lorraine has been with us for 6 seasons now and she is responsible for all the beautiful plantings outside and table decorations throughout the club inside. 

Flower Bed At #14 Tee
Flower Bed At #5 Tee
Flowers At Bag Drop & Ladies Presidents Garden 
Gull Bed & Flowers Behind #10 Tee


Thursday, May 22, 2014

New Patio & Bocce Court

Construction on the new patio system and bocce ball court is completed outside the Quarter Deck and ready for the 2014 summer season. We hope this new addition to the club will provide many hours of fun and enjoyment for all members and families. The project was completed in only a few weeks and the final product turned out better than expected. The Har-Tru clay court will provide an exceptional surface for many rousing games of bocce and plenty of family entertainment all summer with the gas fire pit.

Removing Trees To Get Project Started
Week #1
Week #1
Week #2
Week #2
Week #3
Finished Product

Before

After

Wednesday, May 14, 2014

Sailboat Morings

Today we attached the moring balls to the anchors out in beautiful Gull Lake. We have spent the last week preparing the yacht club area for the sailing season ahead and the Star fleets' Tulip Tune-Up Regatta this coming weekend. 

Inflating Moring Balls
In the spring the moring balls are moved from storage and inflated with air. The chains/clevises are inspected and replaced as needed to insure they remain secure throughout the summer season. Installing both moring fields and the channel line takes three guys about 2 hours to complete.

Preparing To Load the Pontoon Boat

Sam Attaching Moring To Anchor Chain

North Moring Field

South Moring Field

Thursday, May 8, 2014

Spring DryJect

The DryJect process is 21st century aerification at it's finest and leaves virtually no trace behind on the playing surface. This is the first season we have used the DryJect technology on our greens and we are very excited about the results this will make throughout the golfing season for us. We plan to use this form of aerification in the spring each season to minimize the disruption to the playing surface, that conventional core aerification typically leaves behind.

The DryJect machines inject kiln dried sand into the greens to a depth of 5-6" on 2X3" spacing with very little disruption. Our target was 1 ton of Sand/Green and we actually did better than that, using 23 tons total on all 19 greens. That's pretty impressive to think about! 

In the above picture you can see the fresh sand channels that have been injected into the profile of the green, providing many benefits for the overall health of the green and playing conditions. This process leaves behind a very small hole on the surface and a large deposit of sand beneath, deluting organic matter, along with promoting more healthy vigorous root systems and providing better water infiltration.



 
Short Video Showing the DryJect Machine In Operation.


The Crew Getting a Lesson On How the Machines Operate

Sand Delivery

Preparing To Fire Up the First Machine and Observe Operation.

Check out this link for more information on the DryJect technology. www.dryject.com/howitworks